Bathroom remodel: budget for the work behind the tile

A bathroom is several overlapping scopes in a small space. A tile allowance tells you little about the preparation, plumbing, and waterproofing included.

Updated · By Renovation Guides

Separate the five packages

PackageAsk the bidder to describeEasy omission
Strip-outWhat is removed, protected, and disposed of.Making good in the room below or next door.
PlumbingFixture positions, valves, drains, and reconnections.Changes needed after opening the floor.
WaterproofingSystem, substrate preparation, junctions, and checks.Niches, benches, penetrations, and responsibility for leaks.
TileMeasured surfaces, layout, adhesive, grout, and edge details.Waste, cuts, preparation, and trims.
CompletionVentilation, lighting, accessories, painting, and cleanup.Fan duct route, electrical work, mirrors, and screens.

Floor area is not tile area

Use floor area for the bathroom calculator scenario. Measure wall and shower surfaces separately for a tile quote. Two rooms with the same footprint can have very different tile quantities if one has a tiled shower and the other has full-height tiling throughout.

Worked example · hypothetical figures

A hypothetical bathroom has 6 m² of floor tile and 18 m² of wall tile. At an assumed supply price of GBP 35/m², 24 m² of tile is GBP 840 before waste. A separate 10% purchasing allowance makes the example order 26.4 m² and GBP 924. Those figures still exclude installation, preparation, waterproofing, trims, and tax unless the supplier includes them. The waste percentage is an example, not a universal rule.

Put a price basis against hidden repairs

You cannot know the condition of concealed framing from a finished surface. Ask how a discovery is documented, whether a unit or day rate can be agreed, who approves the change, and when work pauses for a decision. A contingency is a budget reserve; it is not permission to spend without approval.

Ask a qualified installer to specify the waterproofing work and how it will be checked. This guide does not prescribe a construction method or certify a system. Keep the product records and completion documents with the contract.

Make selections in an order that avoids rework

  • Confirm layout and fixture positions first.
  • Choose the bath, tray, shower fittings, and concealed components before closing surfaces.
  • Confirm the vanity dimensions and service positions.
  • Finalize tile layout, edges, and glass measurements with the relevant installers.

A standard-size fixture only saves money if it fits the planned opening and services. Ask for an installed change price before swapping products.

One question that exposes an incomplete quote

If I accepted this quote and bought only the products listed in it, what else would I need to pay for before the bathroom is usable? Ask for the answer in writing. Compare it with the exclusions, provisional sums, and fixture allowances.