Planning notebook

Australia renovation budget: write the brief before comparing quotes

The same room can generate very different quotes when the brief leaves products and inclusions open. Start with one written specification.

Updated · By Renovation Guides

Prepare one brief for every bidder

The NSW Government quote guidance below emphasizes describing the job and specified materials clearly. Use it as a practical starting point; contracting and approval requirements must be checked with the relevant state, territory, and local authority for your project.

  • List what is removed, retained, and installed.
  • Attach a measured plan, product specifications, and condition information.
  • Describe access, parking, occupancy, protection, and waste arrangements.
  • Ask for tax treatment, allowances, permissions, exclusions, and timing.

Compare an allowance with the actual selection

Worked example · hypothetical figures

An invented AUD 22,000 bathroom quote includes AUD 2,000 for the listed fixtures. Your comparable installed selection is AUD 3,100, creating an AUD 1,100 shortfall. If AUD 450 of disposal is also excluded, the adjusted known scope is AUD 23,550, before any other unresolved items.

Agree how a variation is documented

Before signing, ask how a change is described, priced, approved, and reflected in the schedule. The NSW quote guidance discusses written variations. Use the rules and contract requirements that apply in your jurisdiction rather than assuming every Australian project has the same legal terms.

Describe the site constraints

Stairs, narrow access, shared buildings, storage limitations, and material lead times can change how the job is carried out. Ask which assumptions the contractor used and what happens if a specified product is unavailable. A substitution should identify the specification and price effect, not just a new product name.

Using the Australia preset

The calculator displays AUD and m². Its country factor of 1.52 and city modifiers are illustrative assumptions. It has no verified city bid dataset and no separate GST calculation. A complete local installed rate should state whether GST and the listed exclusions are included.

Sources and the limits of these examples

The links below support the consumer-protection or safety context. They are not sources for the example prices. All example amounts on this page are invented to show the arithmetic, in the stated currency; they are not market averages.

Build a budget scenarioPrint the scope checklist